Green Zone
Good! Try to keep the level in the
green zone for the best cutting and
optimum machine performance.
11) EXTENSION CABLE SELECTION
The machines are factory fitted with a 3 metre length of cable with conductors of 1.5mm² sections each:
Yellow Zone
Indicates there is too much
pressure on the drill. Ease off to
get back to the green zone.
10
Red Zone
Overload: Back off immediately as
continuing to apply too much force will
cause the motor to cut off.