3.
Pull cable (65) downwards and around the second pulley (49). Attach this pulley to
the main support tube (05) using the pulley bracket (17), 1 bolt (25) and 1 nut (39).
4.
Pull cable (65) upwards and around the third pulley (49). Attach this pulley to the
bridge tube (08) bracket and secure using 1 bolt (25) and 1 nut (39).
5.
Pull cable (65) downwards and fully screw in the bolt on the end of the cable to the top
of the weight bar (19).
6.
Attach the lat bar (12) to the front end of cable (65), and secure using 1 X1 hook (62).
STEP 5
1.
Attach the pull unit (09) to the bridge tube
(08), insert the pull unit axle (21) through 2
metal bushings (31A) and secure using 2
washers (36) and 2 nuts (40).
2.
Attach the right-hand butterfly arm (10R)
to the right side of the pull unit (09) through
2 metal bushings (31) and secure using 2
washers (36) and 1 nut (40). Perform the
same procedure to attach the left-hand
butterfly arm (10L) to the pull unit (09).
3.
Insert the rubber stop (52) to the bracket on
the upright support tube (05), then adjust the
pull unit (09) to match the hole in the bracket.
4.
Place the butterfly arm pads (53) onto the
butterfly arms (10R and 10L), then insert a
50mm flat cap (46) to the ends of the butterfly
arms.
5.
Attach a handlebar (11) to the right-hand
butterfly arm (10R) and secure using 3 bolts
(22) and 3 washers (33). Perform the same
to attach the handlebar (11) to the left-hand
butterfly arm (10L).
6.
Attach the pulley bracket (20) to each side of
the main support tube (05) and secure using 2
bolts (23), 4 washers (35) and 2 nuts (39).
STEP 6
1.
Attach the lat bar cable (65) to the opening
bracket at the front of the bridge tube (08).
Note: The ball stopper of the cable should be
underneath the bridge tube. Run cable (65)
over the small pulley (49A) and put a small
pulley cover (50) on each side of the pulley.
Note: Cable (65) has to come out of the pulley
covers (50) through the opening. Secure pulley
(49A) to the bracket using 1 bolt (26) and 1 nut
(39).
2.
Pull cable (65) towards the back of the
machine through the upper opening in the
main support tube (05) and around the first
pulley (49), then attach this pulley to the
bridge tube (08) bracket and secure using 1
bolt (25) and 1 nut (39).
30