OLIMPIA
SETTING AND OPERATION
I
WARNING: The level (LEVEL) contact ONLY accepts voltage-free signals
Once all installation operations have been completed you are ready to start the pump.
Priming
Connect the suction hose to the suction fitting on the pump.
−
Connect the other end of the suction hose to the foot filter.
−
Immerse the foot filter inside the product jerry can.
−
Connect the drain hose to the fitting and put the other end into the tank, above the maximum liquid level.
−
Start the pump at top speed, open the priming fitting by turning the knob anticlockwise and wait until liquid
−
flows out of the hose connected to it.
Once you are sure that the pump is completely full of liquid, close the fitting and the pump will start dosing.
−
Adjusting the flow rate
The flow rate can be varied by adjusting the frequency regulating knob on the front of the pump.
Pump operation is stopped by turning the knob fully anticlockwise.
Indication LED
The LED on the front of the pump indicates its operating status:
Flashing in time with the magnet – Normal operation.
−
Flashing slowly without dosing – Functional stop.
−
Flashing quickly without dosing – Level alarm.
−
LED switched off – power supply disconnected or insufficient voltage (< 90 Vac).
−
Cod. EM00136047_rev. 2.0
Fig. 7: Connection Diagram
Input A = power supply
Input B = Level
OPERATION
DosingPump.ir
4