Descargar Imprimir esta página

Brizo 8CH-600S Manual Del Usuario página 5

Instrucciones de la interfaz digital del baño turco

Publicidad

Idiomas disponibles

Idiomas disponibles

Figure 3
Adhesive Liner
Figure 4 - Installation Directions
Steam head should be mounted
Steam head Installation
12" to 18" above the finished
Steam head should be mounted
floor or 6" above the rim of the
12" to 18" above the finished floor
tub and as far away from the
or 6" above the rim of the tub as
bather and interface as possible
far from the bather as possible
(opposite wall preferred).
and away from the user Interface
(opposite wall preferred).
Coupler
Interface Cable
8CN-600S, 8CB-600S or 8CH-
Locate away from the direct
600S interface required. Locate
away from the direct line of shower
spray and do NOT locate above
steam head. Opposite wall from
head. Opposite wall preferred.
5
to Generator
line of steam spray and do
NOT locate above steam
steam head is preferred.
113040 Rev. C

Publicidad

loading

Este manual también es adecuado para:

8cb-600s8cn-600s8cn-600s-pn-l8cn-600s-gl-l