PRELIMINARI - PRE-INSTALLATION INFORMATION - PRÉALABLES - VORBEREITUNG -
PRELIMINARES - ПРЕДВАРИТЕЛЬНАЯ ПОДГОТОВКА - ΠΡΟΕΡΓΑΣΙΕΣ - 引言
ING
Before installation and setting to work
Attention! The feeding pipes have to be rinsed thoroughly before the installation of the mixer, so that no
shavings, welding or hemp residual or other dirt can be found in the pipes. Foreign bodies can enter the
mixer through the rinsed pipes or the general water plant and could damage the washers/ring washers.
In order to guarantee a long use of the product, install the angle valve equipped with filter and clean them
regularly.
Before the setting to work, unscrew the aerator and rinse it very well.
- TECHNICAL DATA
- Minimum working pressure 1 bar
- Maximum working pressure 5 bar
- Recommended working pressure 3 bar (in case of water pressure higher than 5 bar it is recommended
to install pressure reducers)
- TECHNICAL DATA – Electronic box
General
• Dimensions:
length: 256 mm/10,1 inch
width: 174 mm/ 699 inch
height: 74 mm/ 2,9 inch
• Weight : 3.0-3.5kg / 6,6-7,7lbs
Electricity
• Supply voltage: 100 - 240V AC / 50-60Hz
• Power:
stand by: < 1W
max.: < 45W
• Rechargeable battery back up: for operation during power breakdown
Water supply
• Max. static pressure: 1000 kPa/10 bar
• Recommended operating pressure: 100-500 kPa/1-5 bar
• Test pressure: 1600 kPa/16 bar
• Difference of input pressure: < 100 kPa/1 bar
Connections
• TLC15:
inlet: 2x M10x1
outlet: 1x 3/8" AG (male thread)
Flow rate
• TLC15:
max. 15 l/min / max. 4 US gallons/min
a 3 bar/300 kPa open outlet
Temperatures
• Environment: 4-40°C/ 40–104°F
• Humidity: max. 95% (non-condensing)
• Cold water range: 4-25°C/40-68°F
• Hot water range: 40-60°C/ 122-140°F (max. 85°C/185°F during thermal disinfec)
Requested approvals
• EN60335-1, EN15091, EN61000-6-1, EN61000-6-3
5