Installation (continued)
9
Checking the operation of the
pop-up
□
Operate the lift rod (S) up and down to verify
that the stopper (J) opens and closes correctly.
10
Attaching the quick connector
□
Attach the quick connector (T) to the Spout (A)
connection, the hot faucet handle (B) connection,
and cold faucet handle (C) connection. Push until
the connections snap together.
□
Pull down moderately to ensure the connections
have been made.
Click
Click
Click
2
2
B
1
8
S
J
A
C
T