Calibration
When should the tool be calibrated?
•
every morning before starting work
•
when moving to another building site
•
when working with a different material (PVC instead of TPO or instead of EPDM or
vice-versa, thinner or thicker waterproof membrane)
•
change from 110V to 230V or vice-versa
•
change of generator (USA, CAN) or transformer (UK)
Ensure that the project parameters are set correctly (waterproof membrane
material and thickness).
Only use material for calibration which has been defined for the current project.
Calibration process
1.
Use the calibration template and place an isoweld
for it (A).
2.
Push the calibration template on to the corner of the waterproof membrane (B).
3.
Place the inductor into the calibration device and ensure that it is positioned cor-
rectly (C): the arm (D) to the inductor must be resting in the recess (E) provided.
A
4.
Press the
L
5.
Press the
OK
6.
You are now in the calibration program.
7 .
Press the start button (2).
8.
The automatic calibration is completed when there is a beeping sound
for 1 second and the display returns to standard view.
The tool is now calibrated.
46
B
or
button to move to CALIBRATION.
M
button to open the calibration program.
plate into the recess provided
®
E
C
D