Descargar Imprimir esta página

Empire Heating Systems GWT-25W-2 Instrucciones De Instalación Y Manual Del Propietario página 10

Calentador de pared con ventilacion por gravedad

Publicidad

Idiomas disponibles

Idiomas disponibles

62 1/4"
(1581 mm)
Figure 2
Plastering (Figure 4)
In new construction use only plain (not perforated) gypsum lath
around furnace and vent pipe so that plaster "Keys" will not project
into wall space.
Use wood strips nailed to inside of studs and top of bottom plate.
These must be removed before installation of furnace. Lath and
plaster against top projection of Header Plate.
Do not allow wall finish materials to project into furnace recess.
66 1/8"
(1679mm)
WALL
OPENING
Figure 4
Page 10
14 ½"
(368 mm)
FINISHING INSTRUCTIONS
14 ½"
(368 mm)
66 1/8"
(1679mm)
WALL
OPENING
Installing Furnace (Figure 5)
Clear the recess of all debris, and remove any wood plaster-grounds.
Stand the furnace on floor in front of wall opening.
Insert furnace flue into rectangular opening in header plate and
raise furnace carefully (see Figure 5). Swing bottom of furnace into
wall opening with back of legs flush with rear of floor plate. Secure
furnace support legs to the floor plate.
Figure 5
Figure 3
37409-7-0620

Publicidad

loading

Este manual también es adecuado para:

Gwt-35w-2Gwt35-lp