Descargar Imprimir esta página

Uline Koala Kare H-9600 Manual Del Usuario página 4

Stación horizontal para cambiar panales

Publicidad

Idiomas disponibles

Idiomas disponibles

WALL BAG HOOK INSTALLATION
1.
Locate wall stud and measure 44" up from floor in
the desired location. Mark the wall.
NOTE: Position the bag hook so the top of
the mounting plate is level with the 44" mark.
2. Use the bag hook as a guide to mark and drill
three pilot holes.
3. Use the provided 9/32 x 7/8" Phillips flat head screws
to secure the bag hook in position. (See Figure 8)
Figure 8
• Clean surface of unit prior to disinfecting.
• Use a clean nylon brush or a rag to loosen and
remove soil from the textured surfaces.
PAGE 4 OF 12
INSTALLATION CONTINUED
Bag Hook
4. Install the escutcheon plate and turn clockwise to
cover the mounting screws. (See Figure 9)
Figure 9
Escutcheon
MAINTENANCE
• Use disinfectants and detergents that do not contain
overwhelming fragrances.
1-800-295-5510
uline.com
Plate
0623 IH-9600

Publicidad

loading

Este manual también es adecuado para:

Koala kare h-9602