Descargar Imprimir esta página

Leviton EBASE Manual De Instalación página 7

Cimentacion de la estacion de carga de ev para cargadores nivel 2 de leviton

Publicidad

Idiomas disponibles

Idiomas disponibles

3 INSTALLATION
5. Before attaching the aluminum cover, make sure that the foundation rim is clear of any gravel
pieces that might make the adapter cover unstable after installation.
6. Position adapter cover. Secure with 4 provided bolts through the recessed bolt holes in the top of the plate
into the beam inside of the foundation using an M10 Allen wrench.
NOTES:
• If the bolts align with your charger's mounting bracket, you can also use them to attach the charger. Leviton
recommends that you switch to a hex bolt or a flange bolt for this purpose.
• Tighten the bolts with a maximum torque of 15 ft-lb.
7. Follow the installation instructions for your charger.
Completed foundation installation with an attached charger.
5

Publicidad

loading

Este manual también es adecuado para:

07847700061 8