INSTALLATION
WALL DRILLING AND BRACKET FIXING
As a first step, proceed with the following drawings:
● A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the hood
is to be fitted.
● A horizontal line A at 1320 – 1700 mm above the cooker top.
● A horizontal line B at a minimum 926 mm above the cooker top.
● A horizontal line C at a minimum 730 (910 optional) mm above the cooker top.
Mark Points:
● Mark a point (1) on the horizontal line A, 60 mm to the right of the vertical reference line.
● Repeat this operation on the other side, checking that the two marks are leveled.
● Mark a point (2) on the horizontal line B, 80 mm to the right of the vertical reference line.
● Repeat this operation on the other side and on the vertical reference line, checking that the
three marks are leveled.
5
Optional