Descargar Imprimir esta página

Johnson CEFIRO Serie Manual De Instrucciones página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

2.3 Don't install the unit too low, no less than
2.3 meter from the ground.
2.5 Don't allow gaps between the unit and
the wall. When hanging it from the ceiling,
using the enclosed ceiling braskets.
3. INSTALLATION
A. Installing on the concrete wall:
3.1.1 Removed the mounting plate
Unclamping the fixed screws on the
back of main body to removed the mounting
plate.
3.1.3 When the cement has freeze, fit the
mounting plate (use the washer and nut
according to the following)
2.4 When the entrance is wider than the unit, it
is recommended to install two or more units in
parallel. In this case, provide 20-40mm gaps
between the units.
2.6 Don't install the unit in a place where it
is splashed by water, exposed to excessive
steam, explosive gas or corrosive gas.
3.1.2 Fix the bolts in the proper position (Decide
the position with the mounting plate and pour
cement into the bolt holes.)
3.1.4 Install the main body
Set the main body onto the upper end of
the mounting plate and clamp it as shown.
2
V.1

Publicidad

loading