Descargar Imprimir esta página

V-TAC SUN-5K-SG04LP3-EU Manual De Instrucciones página 33

Publicidad

Idiomas disponibles

Idiomas disponibles

5.6 Ba�ery Setup Menu
Battery Setting
Batt Mode
Lithium
Batt Capacity
Use Batt V
Max A Charge
Use Batt %
Max A Discharge
No Batt
Activate Battery
Battery Setting
Start
30%
A
40A
Gen Charge
Grid Charge
Gen Signal
Grid Signal
Gen Max Run Time
24.0 hours
Gen Down Time
0.0 hours
This is Grid Charge, you need select.
Start =30%: No use,Just for customiza�on.
A
= 40A: It indicates the Current that the
Grid charges the Ba�ery.
Grid Charge: It indicates that the grid charges
the ba�ery.
Grid Signal: Disable.
07/08/2021 11:11:10
2.00
0
7
KW
76%
Signal
on
-1.39
0
5
KW
400Ah
Batt
Mode
40A
40A
30%
Batt
40A
Set2
Thu
0.00
0
KW
ON
2.00
0
5
KW
Ba�ery capacity: it tells hybrid inverter to know
your ba�ery bank size.
Use Ba� V: Use Ba�ery Voltage for all the se�ngs (V).
Use Ba� %: Use Ba�ery SOC for all the se�ngs (%).
Max. A charge/discharge: Max ba�ery charge/discharge
current(0-120A for 5kW model, 0-150A for 6kW model,
0-190A for 8kW model, 0-210A for 10kW model, 0-240A
for 12kW model).
For AGM and Flooded, we recommend Ah ba�ery
size x 20%= Charge/Discharge amps.
. For Lithium, we recommend Ah ba�ery size x 50% =
Charge/Discharge amps.
. For Gel, follow manufacturer' s instruc�ons.
No Ba�: �ck this item if no ba�ery is connected
to the system.
Ac�ve ba�ery: This feature will help recover a
ba�ery that is over discharged by slowly charging
from the solar array or grid.
This is Ba�ery Setup page.
Start =30%: Percent S.O.C at 30% system will AutoStart a
connected generator to charge the ba�ery bank.
A
= 40A: Charge rate of 40A from the a�ached
generator in Amps.
Gen Charge: uses the gen input of the system to charge
ba�ery bank from an a�ached generator.
Gen Signal: Normally open relay that closes when the
Gen Start signal state is ac�ve.
Gen Max Run Time: It indicates the longest �me
Generator can run in one day, when �me is up, the
Generator will be turned off. 24H means that it does
not shut down all the �me.
Gen Down Time: It indicates the delay �me of the
Generator to shut down a�er it has reached the running
�me.
This page tells the PV and diesel generator
power the load and ba�ery.
5
- 31-
①③

Publicidad

loading

Productos relacionados para V-TAC SUN-5K-SG04LP3-EU