A. 6pcs Screw M6X25
B. 4pcs Screw M6X8
C. 2pcs Hand-tightened butterfly nut M5
D. 2pcs Screw M5X10
E. 10pcs Nut M6
F. 1pc Nut M12
G. 1pc Metal gasket
Installation:
1. Install the leg tubes using A (Screw M6X25) and E (Nut M6).
2. Install the thermometer on the furnace using F (Nut M12) and G
(Metal gasket). Install the chimney using B (Screw M6X8) and E
(Nut M6).
3. Install the handle using D (Screw M5X10) and C (Hand-
tightened butterfly nut M5).
4. Put the charcoal tray in the furnace and put the grill net on the
top.