Descargar Imprimir esta página

LOWES 1658VA-48-341-900-SR Manual página 17

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with
package contents list and hardware contents list. If any part is missing or damaged, do not attempt
to assemble the product.
Estimated Installation Time: 45 minutes (24 hours for silicone caulk to dry).
Tools Required for Installation (not included): Phillips screwdriver, utility knife or scissors, silicone
caulk, power drill with drill bit, measuring tape, level
INSTALLATION INSTRUCTIONS (Undermount Sink)
Note: This vanity base comes with two
different door/drawer handle options.
1. Gently open the tip-out door (F) and use the
wrench (DD) to loosen the screws holding
the solid wood tip-out tray. Once loosened,
simply lift and slide up to remove (per
diagram 1). This provides access to the two
door handle screws.
The hardwares are packaged separately in the
box. Select your desired hardware finish, and
attach the hardware to the drawer(s)/door(s),
as illustrated in the diagram.
Repeat the same step for the doors (G & H) and
drawers (K & L & M).
Hardware Used
Long Handle-
BB
Champagne brass
Long Handle-
BB
Matte Black
Short Handle-
CC
Champagne brass
Short Handle-
CC
Matte Black
Wrench
DD
1
K
L
M
x 3
x 3
x 8
x 8
x 1
17
3
K
F
L
M
H
G

Publicidad

loading