Descargar Imprimir esta página

ROBLIN Lido Design/3 Instrucciones De Instalación E Utilización página 10

Campana

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 24
GB
chimney stacks to the brackets using the two M4 screws item 12c provided. Fit the lower chimney
sections by expanding the chimneys slightly to allow them from the top of the canopy to clamp around
the upper chimney sections.
IN THE RECIRCULATION MODE:
a. Fit the recirculation spigot R onto the upper chimney wall bracket using the same fixing screws (Fig.
2 item 2).
b. Connect the ducting 150mm (6 INS) not provided between motors item 6 and the recirculation spigot
and secure the connections with appropriate clamping rings or adhesive tape.
c. Remove the grease filters (see paragraph Maintenance) Fig. 5 being sure that the connector of the
feeding cable is correctly inserted in the socket placed on the side of the fan. Before fitting the chimney
to the canopy make the electrical connection as described in the section titled ELECTRICAL. When
the electrical connection has been made, test the lights and the fan motor.
d. Insert the charcoal filter into the base of the motor housing and secure the filter with two metal secur-
ing straps item A as illustrated in Fig. 4.
e. Each chimney stack consists of two sections. Fit the upper sections (Fig. 1 - item 7a & b) first by
expand-ing the chimneys slightly to allow them to clamp around the bracket item 2 and secure the
chimney stacks to the brackets using the two M4 screws item 12c provided. Fit the lower chimney
sections by expanding the chimneys slightly to allow them from the top of the canopy to clamp around
the upper chimney sections.
8

Publicidad

loading