ENGLISH
Then assemble the side gable, RIGHT (part K) in the notches provided on the upper side
planks. Then assemble the top front and rear planks to complete the walls (parts U, U1, U2, F).
The post (part J) is fixed to the concrete slab with a support.
Aim the planks from above and apply glue to the ridges of the planks before assembly.
43