Operation 1:
Cleaning:
Note:
To avoid the air flue being blocked, please clean the big particle waste. (such as
paper, cloth and others)
Before connect to power, Be sure the slide switch is closed.
No. Operation instruction
1 Conect the power to AC 220~240V power socket
2 Push forward " Slide switch" to start
3 Pull backward "Slide switch" to stop
PowerCord
6
Slide
switch