Descargar Imprimir esta página

LF PROJECT SOURCE 67084W-6104 Instrucciones De Instalación página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS
2. Before installation, remove the screw protection
sleeves from the inlet tube. Place the handle
assembly (E) through the mounting holes in the sink.
Secure end valves with handle assembly washers (F)
and handle assembly nuts. Hand tighten handle
assembly nuts onto shank. Lock handle assembly nuts
into position by tightening screws. Do not overtighten.
NOTE: The hot side end valve is labeled.
3. Attach the T-union (2) to the Spout (1) connection,
the hot faucet handle (3) connection,and cold faucet
handle (4) connection. Push until the connections
snap together. Pull down moderately to ensure the
connection has been made.
2
(2 N. m
Max)
3
Click
5
3
1
2
Click
E
F
G
4
Click

Publicidad

loading