Installation Of The Comfocool Q600 - Zehnder ComfoCool Q600 Manual Del Instalador

Ocultar thumbs Ver también para ComfoCool Q600:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 56

4 Installation of the ComfoCool Q600

The unit should be mounted on top of the ventilation
unit. The ventilation unit must be mounted on a support
frame that is level and stands on a suitably solid fl oor.
Each distinct assembly step is outlined below:
1. Assemble the support frame according to the
instructions supplied. Then place it on the fl oor and
ensure the upper surface is level using the adjustable
feet.
2. Place the ventilation unit on top of the support frame.
3. Remove the hygienic covers of the ventilation unit.
4. Place the two adapter plates over the spigot
openings of the ventilation unit. Check that the metal
bracket is pointing to the front of the ventilation unit.
The adapter block marked with an L must be placed
on the left side of the ventilation unit. The adapter
block marked with an R must be placed on the right
side of the ventilation unit.
5. Place the four rubber seal rings over the spigot
openings. Check that the seals are creating an
effective seal between the spigot and the adapter
plates.
6. Connect the data cable to a free ComfoNet plug-in
connection on the ventilation unit.
a. 12 Vdc: Red
b. GND: Black
c. CAN_H: Yellow
d. CAN_L: White
7. Lay the cable through the cable tray of the ventilation
unit.
8. Mount the unit.
Note: never lift the unit alone. It is
heavy and must be mounted precisely;
The units feet should fi t in the recesses of the
adaptor plate. Make sure the seals do not dislodge
while doing this.
9. Fix the fall protection fi rmly to the wall. To prevent
vibrations being transmitted to the wall, ensure that
the fall protection is not under tension.
10. Mount the plastic design front on the unit. Check
that the top of the plastic design front falls in the top
of the unit before you screw the bottom side to the
adaptor plates.
11. Connect the data cable to a free ComfoNet plug-in
connection on the unit.
a. 12 Vdc: Red
b. GND: Black
c. CAN_H: Yellow
d. CAN_L: White
12. Connect the condensation drain to the domestic
waste-water system via a siphon or a water lock of
at least 10cm. Ensure the siphon or water lock is full
of water. The condensation drains of the ventilation
unit and the unit must always be connected with a
seperate siphon each.
LEFT Orientation
Do not install a normal dry siphon on to the unit.
The overpressure in the unit will push the dry siphon
open and cause an airleak.
13. Remove the hygienic covers of the unit and
connect the air ducts.
14. Please refer to the ventilation unit manual for further
installation instructions for the ventilation unit.
15. For optimal performance of the unit it is advised
to program the three different intervals as shown
in example below. (note: the actual start time can
randomly be chosen)
Step
Period
Time
1
WEEK
12:00-12:05
2
WEEK
12:01-12:02
3
WEEK
12:03-12:04
16. Connect the main supply of the ventilation unit and
unit.
For safety reasons, the unit will pause for 15 minutes
before initially activating the compressor.
RIGHT Orientation
Setting
15 - EN

Publicidad

Tabla de contenido
loading

Tabla de contenido