Descargar Imprimir esta página

CSW RECTORSEAL RSH50 VRMDC KIT Instrucciones De Instalación página 2

Relés de capacidad 120/240 monofásicos, bipolares de 60 amperios (maneja cargas de 15 a 60 amperios)

Publicidad

Idiomas disponibles

Idiomas disponibles

L1 OUT
Alarm LED
Power LED
LCD Display
Down Button
Up Button
Mode Button
Auxiliary Terminals
Main Terminals
L1-IN
L1 IN
Technical Support Call 1-866-280-8810
All surge protection devices require a good ground
connection for effective operation
120/240 single Phase, 60 Amp Double Pole
Capacity Relays (handles loads 15 to 60 Amps)
PRODUC T CODE
L2 OUT
RSH VRM60A
RSH-MS60A
U 240
L2-IN
Surge Protecto r
L2 IN
Input
I N S T A L L A T I O N I N S T R U C T I O N S
96424
Type 1 SPD
5ME8
RSH-50
Installation Instructions
1.
Device must be installed in an enclosure suitable for the appli-
cation and environment for which it is being used. Connected
load shall not exceed 60 amps.
2.
Confirm power is OFF prior to performing the installation.
3.
Use the appropriate wire size and type based on the connected
load and torque to the specified ratings.
4.
Connect input and output connections, replace finger guard
covers and then restore power.
5.
Confirm power LED is illuminated and proceed to programming
functions.
6.
Optional mounting feet included to secure enclosure to wall
or structure.
Programming Instructions
Start Up: At power up, load will remain disconnected for 4 minutes.
This delay is not adjustable. To view event logs, press UP button.
- Over voltage events,
- Under voltage events,
E2
To enter program mode - Press and hold MODE button for 2 seconds
Mode
- Utility over-voltage set point. Use the UP & DOWN but-
U0
tons to set the desired over-voltage cut off point between 85–300
vac Press MODE button to advance to next setting.
Mode
- Utility under-voltage set point. Use the UP & DOWN but-
UL
tons to set the desired under-voltage cut off point between 85–300
vac. Press MODE button to advance to next setting.
Mode
- Over/under delay. Use the UP & DOWN buttons to adjust
SU
the delay time between .5 and 60 seconds before the load is discon-
nected when an under or over voltage condition is present. Press
MODE button to advance to next setting.
Mode
- Load restore delay. Use the UP & DOWN buttons to
SP
adjust the delay time between 1 and 600 seconds before the load is
restored after normal power levels have returned.
Mode
- Event-log clear. To retain stored events, set to 1. To clear
EC
ALL stored events, set to 0. Press and hold the MODE button for 2
seconds to save changes and exit.
Diagram
Main Terminals
CU7 Copper Conductors Only
10-14 AWG 35 IN. LBS.
8 AWG 40 IN. LBS.
4-6 AWG 45 IN. LBS.
2-3 AWG 50 IN. LBS
Auxiliary Terminals
CU7 Copper Conductors Only
12–16 AWG 20 IN. LBS.
Open-type
Operating Control
5NT1
RSH VRM60A
E1
- Outages
E3

Publicidad

loading

Este manual también es adecuado para:

96424