Descargar Imprimir esta página

Zuwa SOLARCHECK MOBILCENTER KOMPAKT P80 Manual Del Usuario página 16

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

ZUWA Solarcheck Mobilcenter
4. Mounting and commissioning
1.
Connect pressure hose to pump outlet
3.
Connect return hose to tank
5.
Open tank lid to ensure the circulation
of the air.
16
2.
Fill tank and open ball valve
4.
Connect pressure hose (1)
and return hose (2) to the fill/
vent valves and open valves.
Close stop valve (3).
6.
Insert cable of pump motor
into socket

Publicidad

loading

Este manual también es adecuado para:

Solarcheck mobilcenter kompakt p90134053v11134060-v11