Operating Instructions and Parts Manual
Installation
(Cont.)
other end of safety rope securely to
well seal, well cap or pitless adapter.
NOTE: Discharge outlet is 1-1/2" NPT
threaded.
3. Install piping based on these guide-
lines:
For installations up to 100' (30.5 m)
in depth, use 100 psi (689.5 kPa)
rated polyethylene plastic pipe.
For installations up to 220' (67.1 m)
in depth, use 160 psi (1103.2 kPa)
rated polyethylene plastic.
For depths beyond 220' (67.1 m),
use galvanized steel pipe for the
entire drop pipe.
INITIAL STARTUP/NEW WELLS
Never operate
NOTICE
pump with dis-
charge valve completely closed. This
can cause significant pump damage and
will void the warranty.
To prevent sand-
NOTICE
locking pump, fol-
low this procedure when starting pump
for the first time. Do not start pump
with discharge valve completely open
unless you have followed this proce-
dure first.
1. Connect a pipe elbow, a short
length of pipe, and a gate valve to
pump discharge (at well head).
2. Mount motor control box (for a 3-
wire pump) or fused disconnect switch
(for a 2-wire pump) in a permanently
weatherproof place. Make sure that
controls will not be subjected to
extreme heat or excess moisture.
3. Make sure controls are in OFF posi-
tion.
4. Connect motor leads and power
supply to motor control box or
magnetic starter (see Installation
Wiring Diagrams). Do not start
pump yet.
5. Open gate valve on discharge one-
third of the way. Start pump (see
Figure 8).
6. Let water run until it is clear. (To
check solids in water, fill a contain-
er with water from pump. If any
solids settle after a minute, contin-
ue running pump.)
Temporary wiring
Control
to control center or
center
electrical disconnect box
or
electrical
Temporary piping
disconnect
box
Figure 8 - Temporary connections
while cleaning well for startup
7. Once water runs clear, open gate
valve two-thirds of the way and
repeat step 6.
8. Once water runs clear at this set-
ting, open gate valve completely
and run pump until water is com-
pletely clear.
9. Remove gate valve (see Figures 9
and 10).
10. Install sanitary well seal or pitless
adapter unit, well unit, electrical
conduit and surface piping.
Installation must meet all applica-
ble national and local codes.
Ventilated
well cap
Submersible
cable
Pitless
adaptor
Check
valve
Tape cable
to pipe
Pump
Figure 9 - Typical Pre-charged Tank Installation
5
Deep Well Submersible Pump
CONNECTING TO TANK/WATER
SYSTEM
DANGER
!
Gate valve
High pressure and tank explosion haz-
ard! To prevent overpressurization,
install a pressure relief valve capable
of releasing pump air flow at 75 psi
(517.1 kPa) when using air-over-water
pressure tank. When using a pre-
Pump in well
charged pressure tank, install a pres-
sure relief valve that will release entire
air flow at 100 psi (690 kPa). Install this
valve between pump and tank.
NOTICE
plastic pipe. Pipe joint compound can
cause cracking in plastics.
NOTICE
freeze. Failure to do so could result in
serious damage to equipment and will
void warranty.
CONNECTING TO TANK/WATER
SYSTEM
See Figure 9 for illustration of piping con-
nections to pre-charged pressure tanks.
Before starting pump, check to make
sure that pre-charged air pressure is 2
psi (13.8 kPa) below pump cut-in set-
ting. (For example, in a tank used with
a 30-50 psi pressure switch, the pre-
Electrical disconnect
Control box
(3 wire models)
Union
Relief valve
Gate valve
CUT IN
CUT OFF
PSI (kPa)
PSI (kPa)
20 (137.9)
40 (275.8)
30 (206.8)
50 (344.7)
40 (275.8)
60 (413.7)
Use only Teflon
®
tape on joints in
Do not allow pump
or piping system to
Pre-charged tank
Pressure switch
Pressure gauge
To house service
Pre-charge Tank
PSI (kPa)
18 (124.2)
28 (193.1)
38 (262)