Descargar Imprimir esta página

Ariston A45V Instrucciones De Instalación página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

The Controls
_ A_STON
...............
Power Switch
ON/OFF
Setting the
Program
Program
Options
Starting the Dryer
Press the On/Off button IN to turn the dryer on.
The dryer will not operate unless the power On/Off button is IN.
To set the required program, all you have to do is turn the Program
Control knob until the required selection appears in line with the
indicator.
Automatic Sensor Dry Programs
(for load sizes more than 2 Ib -1 kg)
1.
Extra Dry Regular Cottons (high heat)
This gives driest results.
Some bulky items or large load of new towels may
appear slightly damp after this program and require a
short additional period of timed drying.
2.
Light Dry Regular Cottons (high heat)
3.
Iron Dry Regular Cottons (high heat)
This gives the dampest results.
4.
Extra Dry Permanent Press (low heat)
5.
Light Dry Permanent Press (low heat)
6.
Iron Dry Permanent Press (low heat)
Timed Dry Programmes
(for load sizes less than 2 Ib -1 kg)
7.
40 minutes (low heat) include cool tumble followed by the
Crease Care phase.
8.
30 minutes (low heat) include cool tumble followed by the
Crease Care phase.
9.
20 minutes (low heat) include cool tumble followed by the
Crease Care phase.
10.
fi_ Air fluff, 20 minutes of cool tumble.
11. _
Easy Iron Program, see section "Easy Iron Program".
For description of other programs see next page.
Press and release the START button to commence a drying program
(The drying program must have been selected first).
The Drying Light will then come on.
NOTE: If the door is opened during a program, the dryer will
automatically
stop. To continue the program, after closing the door,
the START button must be pressed.

Publicidad

loading