Installation Instructions
3. PREPARE THE AIR CONDITIONER
(continues)
Remove the ground screw from the left
E.
need them later in the installation.
Slide the air conditioner from the case by
F.
gripping the base pan handle and pulling
forward while bracing the case. Do not pull or
lift on the foam discharge area.
4. PREPARE THE CASE
Attach the top rail gasket to the bottom of
A.
the top rail.
Install the top mounting rail with 4 type A
B.
screws from the inside of the case. Press
firmly to drive the screws into the gasket and
through the top mounting rail.
Top mounting rail
49-7789
4. PREPARE THE CASE
Slide each side retainer onto the edge of
C.
each according panel. The figure shows the
orientation of each accordion panel and side
retainer assembly relative to the case from a
top view of the unit.
Do not
pull or
lift in this
area—
damage
Slide the left and right accordion panels into
D.
to the
unit may
the top and bottom mounting rails.
result
Top left
FRONT
E.
type A screws.
SIDE RETAINER
WINDOW FILLER PANEL
SIDE RETAINER
WINDOW FILLER PANEL
Top mounting rail
Top right
11