1. Disconnect the building-side connecting
cable from the power supply and secure it
against being switched on again. To do
this, trip the corresponding circuit breaker
of the house installation.
2. Figure 1: Loosen the screws (1),
remove the light cover (2) and insert a
suitable G9 bulb. Close the light again and
tighten the screws (1).
Read on here if you would like to install
the light with a ground spike. Otherwise,
continue reading at point 5.
3. Guide the building-side connection
cable through the ground spike (4) and the
cover of the connection box (3) as shown
in Figure 2. Connect the connection cable
to the luster terminal as shown in Figure 4
and seal it in the connection box (3).
4. Secure the ground spike (4) to the
socket pillar using the screws on the
ground spike (5). Anchor the column in the
ground with the ground spike.
5. Mounting without ground spike (Figure
3): Remove the mounting plate (6) by
loosening the two screws (7).
6. Now mount the mounting plate on firm
ground using the enclosed screws and
dowels (8).
7. Guide the building-side connection
cable through the cover of the connection
box as shown in Figure 2. Connect the
connection cable to the luster terminal as
shown in Figure 3 and seal it in the
connection box (3).
8. Place the socket pillar on the mounting
plate and fix it in place using the screws
(7).
9. Turn the power back on. The installation
is completed.
Sous réserve de modifications techniques
LEDs Com GmbH, Dohrweg 2a, D-41066 Mönchengladbach, www.leds-com.de, Tel. +49 (0) 2161 - 5 75 99 76
Français
Figure 1
Figure 3
Éclairage directionnel (LC-L-394) - Instructions de montage
Figure 2
Figure 4
05/2024