Step 1:Bottom Frame Set-up
C1
C2
B1
C2
B2
B1
A
C1
B2
Fig.1
A
Fig. 1-1 & Fig. 1-2, Screens setup:
Insert the Left Screen (B1) into the Big Screen (A), pull it down
to fix them(Fig.1-2); then use Screw (AA), Washer(CC) to secure
Left Screen(B1) and Big Screen(A); Do the same for Right(B2) and
Big Screen(A)as( Fig.1-1). Don't tighten the screws completely at
this time.
Fig. 1-3, Frame setup:
Connect the Long Bar(C1) and the assembled screens with
Screw(BB) and Washer (CC); Do the same for Short Bars (C2)
and the Screens, until you get the complete frame set up as
shown in Fig.1.Don't tighten any of the screws completely at this
time.