STEP 1 CHOOSING THE RIGHT LOCATION
Suitable wall types: reinforced concrete walls, brick walls. The chosen wall must be suitable to hold and
maintain the awning. We will not be responsible for any damage to persons, to the property and to the awning
due to weak support of installation wall.
Before mounting your awning, select the required mounting height (C) in accordance with the required angle
of slope (α°) and the front line (H) of the awning. To avoid head injuries, the front line (H) should always be
greater than your own height
α°
80°
H+450mm
75°
H+650mm
70°
H+850mm
65°
H+1050mm
60°
H+1250mm
INSTALLATION DISTANCE FROM AWNING TO WALL OR CEILING
≥100mm
≥600mm
MOUNTING OF THE WALL BRACKETS
STEP 2
Remove the plate (2) and the retaining screws (1) of each wall bracket. Turning adjusting screw (3) with a
hex key 6 mm counter clockwise. Measure the distance in Figure. This distance must be greater than 40 mm,
(when the distance equal to 45 mm, the angle of inclination of awning is 80 °). Must be the same distance for
all wall brakcets (4).
C
L=2.5m
L=3m
H+520mm
H+780mm
H+1030mm
H+1270mm
H+1500mm
ceiling
EN
≥600mm
12
KEN002VKM
v1a • 17.04.2020
L