Descargar Imprimir esta página

Pentair PRO-SOURCE Manual Del Usuario página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
INSTALLATION
The tanks listed below are pre-charged, or filled with air
at the factory, as shown under "Product Information –
Pre-Charged Tanks," below. When installing tank or if
drawdown decreases significantly, check as follows:
1. To check air charge in tank, shut off electric power to
pump, open faucet near tank, and drain completely.
2. At air valve, unscrew air valve protective cap and
check tank air pressure with tire gauge. See Chart 1
for the correct pressure setting. If needed, adjust the
tank pressure up or down. To do this, bleed air from
or add air to tank through valve on top of tank.
3. Use soap or liquid detergent to check for air leaks
around air valve. Continuous bubbling indicates leak.
If necessary, release air pressure and install new core
in air valve (same as used for automobile tubeless
tires.)
NOTICE: Always set or check tank pre-charge with NO
WATER in tank and no water pressure in system. If you
have already pumped water before setting or checking
the pre-charge pressure, turn the pump off.
NOTICE: Replace and tighten air valve protective cap
after pressure is adjusted correctly. Failure to replace
cap may allow loss of air pressure and lead to tank
waterlogging and diaphragm failure.
Chart I
(The first number on the pressure switch is the pump
"ON" setting; the second number is the pump "OFF"
setting.)
When Pressure Switch
Setting Is
20-40 PSI (138-276kPa)
30-50 PSI (207-345kPa)
Maximum
Catalog
Capacity
Number
US Gals (L)
PS2-S01
2 (7.6)
PS5-S02
5 (19)
Adjust Tank
Precharge (PSI) To
18 (124kPa)
28 (193kPa)
Product Information – Pre-Charged Tanks
Drawdown - Gals (L)
Equivalent
to Standard
Tank
20-40 PSI
(US Gals) (L)
(138-276kPa)
6 (23)
0.7 (2.7)
15 (58)
1.8 (6.8)
This tank is designed to be supported by the system pip-
ing either directly above the pump or in a convenient
location in the piping system as close to the pump as
possible.
NOTICE: Tank capacity is different than drawdown.
Tank capacity is the actual physical volume of the sheet
metal that makes up the tank.
STANDARD TANK REPLACEMENT
When replacing a standard tank in a water system with
a pre-charged tank, no bleeder orifices or Air Volume
Control (AVC) are required. When sizing a pre-charged
tank to replace a standard tank, the tanks should have
equivalent drawdowns.
Disconnect all power to pump and bleed all pressure
from system before working on pump, tank, or piping.
Figure 1: Air valve and protective cap.
30-50 PSI
Maximum
(207-345kPa)
Water Temp
0.6 (2.3)
210°F (99°C)
1.5 (5.7)
210°F (99°C)
Hazardous voltage and hazardous pressure.
Air Valve
Protective
Cap
Air Valve
3820 1100 PS
Tank
Tank
Diameter
Height
Discharge
in. (mm)
in. (mm)
8.4" (213)
12.6" (319)
10.6" (270) 16.2" (411)
3
Tank
Pre-Charge
Pressure
Tapping
PSI (kPa)
3/4"
20 (138)
3/4"
30 (207)

Publicidad

loading

Este manual también es adecuado para:

Ps2-s01Ps5-s02