5)
6)
Install the display.
- Install 2 x poles onto the pump.
- Install the new display in the
display box.
Install the display box on poles.
110008109E B
Install cables and plugs
(see the section on cable installation).
- Install the display plug on the inverter
terminal "modbus".
- Install 4 sensor cables on the sensors.
- Use strips to collect the cables.
110001640DV2-3
15