5. Transportation & installation

5.1. Transportation

Secure the unit with straps to prevent sliding or
tipping during transport.
Transport the unit only in a horizontal position.
The unit should only be placed on the feet posi-
tioned in the bottom of the product.
If the unit is moved when the temperature is near
or below 0°C (32°F), make sure it is fully emptied
of water to avoid damage.

5.2. Installation preparations

Read all the included information for safety rea-
sons before installing the equipment.
Follow the applicable laws and regulations at the
time of purchase, in addition to this manual.
Installation must always be in accordence with
local legistration.
Consider leaving at least 1m free space around
the unit for easier maintenance.
Rinse the pipeline thoroughly before connecting
the unit.

5.3. Mounting Instructions

For safe mounting, note the following:
Only install the unit in a frost-free area.
Use a stable brick or concrete wall, or a separate
frame anchored to the floor.
Refer to the installation drawing for recommend-
ed installation height. The feet can be adjusted to
stabilize the unit on uneven surfaces.

5.4. Electrical installation

Refer to section 11 for electrical diagrams and rat-
ings.

5.4.1. Power supply

Connection instruction is mounted on the cables.
The phase order is subordinated.

5.4.2. Earth leakage circuit breaker (ELCB).

Use an earth leakage circuit breaker (ELCB), also
known as a residual current device (RCD) or a
residual current circuit breaker (RCCB), in a system
that includes a variable speed drive connected to 3
phase 400V.
The trip level of the ELCB must be 300mA.
Note that the 30mA used in households can malfunction
due to earth leakage.
36

5.4.3. Service switch

The unit must always be connected to the main sup-
ply through a separate service switch.
BF4
Voltage:
3/PE 380-528VAC
Frequenz:
50/60HZ
Motor load:
5.5 kW
Nominal cur-
14.2 A
rent:
Fuse:
20 A
4 x 2.5 mm2
L1, L2, L3, PE
BF8
3/PE 380-528VAC
50/60 Hz 48-62
11 kW
27 A
32 A
4 x 6.0 mm2