INSTALLATION DIAGRAM FOR Millennium-LB™ RO SYSTEM
Sink
JGV-ASVPP1LF
(Angled Stop Valve)
Cold Water
Feed Supply
Stage 6: Carbon Post Filter
Stage 5: Carbon Post Filter
Stage 4: TFC
Membrane
Stage 3: Carbon Block
Stage 2: Carbon Block
WARNING:
CONNECT YOUR SYSTEM TO THE COLD WATER SUPPLY ONLY. DO NOT USE A WATER
SUPPLY THAT IS MICRO-BIOLOGICALLY UNSAFE, OR OF UNKNOWN SOURCE WITHOUT
ADEQUATE DISINFECTION BEFORE OR AFTER THE Millennium-LB™ RO SYSTEM.
Tubing
Directions
1/4" Green
Feed water supply line to inlet. Feed ball valve labeled "TO FEED"
3/8" Blue
Carbon post filter elbow labeled "TO FAUCET" to center threaded shank of faucet
3/8" Yellow
Carbon post filter tee labeled "TO TANK" to ball valve on storage tank
Flow restrictor labeled "TO DRAIN" to DS-EZW4 drain clamp.
1/4" Red
(shown with standard faucet)
1/4" Red Rubing
from Flow Restrict
to Drain Clamp
Color Coded Tubing-Standard Faucets
3
3/8" Blue Tubing
to Faucet
1/4" Green Tubing
3/8" Yellow Tubing
to Tank
Stage 1: Sediment Prefilter
JGF-PP3212U7W
(Faucet Connector)
DS-EZW4
(Drain Saddle)
Storage Tank