Adding staples
(Fig. B)
Turn the product over.
Squeeze the release buttons
rod
out of the magazine
[
9 ]
NOTE
Use the window of the fill indicator
u
check if the magazine
(Fig. C)
Add staples to the magazine
Slide the push rod
magazine is completely closed.
The release buttons
to indicate that the magazine
locked.
Adding nails
(Fig. B)
Turn the product over.
Squeeze the release buttons
Pull the push rod
9 ]
[
NOTE
Use the window of the fill indicator
u
check if the magazine
. Pull the push
[
7 ]
.
[
8 ]
to
[
]
is empty.
8 ]
[
.
[
8 ]
back in until the
9 ]
[
must click into place
[
7 ]
is properly
8 ]
[
.
7 ]
[
out of the magazine
to
[
]
is empty.
[
8 ]
(Fig. D)
Identify the nail icon
rod
and insert the nails into the
[
9 ]
magazine
[
8 ]
Slide the push rod
magazine
[
8 ]
The release buttons
to indicate that the magazine
locked.
Operation
Stapling/Nailing
(Fig. G)
Press down the safety contact
workpiece.
Hold the product firmly aligned with the
work surface before firing. This ensures the
complete penetration of the staple or nail.
Pull the trigger
against the workpiece.
NOTE
.
8 ]
[
Do not trigger the product when the
u
magazine is empty to prevent excessive
wear.
on the push
.
in until the
9 ]
[
is completely closed.
must click into place
7 ]
[
is properly
8 ]
[
onto the
[
]
while holding the product
[
3 ]
GB/IE
39