Descargar Imprimir esta página

GreenWorks Pro BL80L02 Manual Del Operador página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

EN
4. Tighten the screws.
8.5
INSTALL THE BATTERY PACK
If the battery pack or charger is damaged, replace the
battery pack or the charger.
Stop the machine and wait until the motor stops before
you install or remove the battery pack.
Read and understand the instructions in the battery and
charger manual.
1. Align the lift ribs on the battery pack with the grooves in
the battery compartment.
2. Push the battery pack into the battery compartment until
the battery pack locks into place.
3. When you hear a click, the battery pack is installed.
8.6
REMOVE THE BATTERY PACK
1. Push and hold the battery release button.
2. Remove the battery pack from the machine.
9
OPERATION
Before you operate the machine, read and understand the
safety regulations and the operation instructions.
Be careful when you operate the machine.
WARNING
1
IMPORTANT
WARNING
English
9.1
CONTROLS
9.2
START THE MACHINE
1. Push the lock-out lever (1) and pull the trigger (2).
1
9.3
STOP THE MACHINE
1. Release the trigger to stop the machine.
9.4
ADJUST THE LENGTH OF THE
CUTTING LINE
While you operate the machine, the cutting line gets worn
shorter. You can adjust the length of the cutting line.
1. Hit the trimmer head against the ground while you
operate the machine.
2. Line is automatically released and the cut-off blade cuts
the excess length.
8
2

Publicidad

loading

Este manual también es adecuado para:

Stb4562101202Gst80320