5.2
Connecting HCS T2 sensors to gateway
1. Load the Hilti Concrete Sensors app on to a mobile device.
2. Take all the sensors needed for your application out of the packaging.
3. Activate the sensors by exposing the sensors to direct light.
If the red indicator LED does not flash, try a flashlight or direct sunlight.
4. Create a new project and corresponding concrete placement operations, including name and date of
concrete placement operation, in the app by following the instructions.
▶ Android systems → Use the plus sign (+) to add a new project
5. Check the concrete placement zone and evaluate the appropriate position for each sensor.
6. Mark each sensor with a corresponding name.
*2399131*
2399131
English
23