(Fig. C)
- Unfasten 8 screws (V1 Ø3.9×9) and remove the element (D) from the trellis (E) (Fig.
- Unfasten 2 screws (V2 Ø4.2×12.5) fixed to the top of the motor chamber (C) (Fig.
Fasten the element (D) to the motor chamber (C) with the 6 screws (V2 Ø4.2×12.5) (Fig.
C
1
(Fig. D)
- Measure the height "F" as indicated in Figure D.
- Cut the pipe (G) to required length, so that the pipe (G) is installed perfectly vertical.
D
CEILING
14
E
8 - Ø3.9×9
Keep screws to
element when
Ø 8"
Ø 203 mm
G
V1
V2
6 - Ø4.2×12.5
x trellis and
installed
D
G
1
).
) before fixing the element (D).
2
).
3
2
Before xing the
element, unfasten
3
C
d e
t s i
o n
( F r
2 screws
(Ø4.2×12.5)
D
)