Emerson NetSure 501 A50 Manual De Usuario página 122

Sistema de fuente de potencia en subrack de 19-pulgadas
Tabla de contenido

Publicidad

114
Apéndice 2 Diagrama de Cableado
DU
Front view
PE
User connector board
To user PE
Monitoring backboard
for M501D
Load alarm signal connection
AC scheme 2
of the monitoring backboard
Configuration explanation:
1. AC input: three schemes optional. The 3P+N+PE/380V is one option. See AC input distribution schemes for other options.
2. Rectifiers: 2 ~ 5 pieces optional.
3. The number of the battery MCBs is determinded by requirements. 2 ~ 4 routes optional.
4. BLVD and LLVD: the DC output routes and battery routes are protected by MCBs. The contactors are normally-closed type. The LLVD contactor KM2 is optional.
5. DC distribution: DU is optional. The sum dimension of the load MCBs should be smaller than 410mm. The MFU can be configured with load MCBs. The sum dimension of the load MCBs should be smaller than 190mm.
6. If the monitoring module is M501D, refer to the wiring of the monitoring backboard for M501D. If the monitoring module is M800D, refer to the wiring of the monitoring backboard for M800D.
7. Load alarm signal connection of the monitoring backboard: the first 8 load alarm signal cables connect to the first 8 load alarm terminals of the monitoring backboard. The rest 2 signal cables connect to the 9th and 10th terminal of the monitoring
backboard if the DU is not configured, or connect to the signal transfer board of the DU if DU is configured.
8. There are 22 load alarm signal cables in the DU, all connected to the monitoring backboard via the two signal transfer boards in the DU.
9. This diagram describes the flexible configuration system. The actual wiring, devices and components configured are determined by the configuration document and described in corresponding design document.
MFU
Monitoring backboard for M800D
Back vi ew
Figura 2 Diagrama de Cableado del NetSure 701 A51 (PS48300-3A/3200)
Sistema de Fuente de Potencia en subrack de 19 Pulgadas NetSure 501 A50, NetSure 501 AA0, NetSure 701 A51
Rectifier subrack1
Rear view
To 1- PL busbar
AC input distribution schemes:
Scheme 1
Scheme 2
Technical requirement:
1. Before wiring, attach specified labels to the corresponding positions according to the design document.
2. Peel the heat shrinkable tube before wiring if the cable terminal is wrapped with it. If the cable needs no connection,
keep the tube and bind the cables as required.
Scheme 3
Manual de Usuario

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Netsure 501 aa0Netsure 701 a51

Tabla de contenido