Paslode T250-F16 Serie Manual De Instrucciones página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Coil Nailers
Step No. 1 – Grasp the nailer handle firmly with one
hand and with the other hand unlatch the magazine
cover clip. Swing the magazine door open.
Step No. 2 – Adjust the loading tray for nail length (if
required) by depressing the button on the post and
raising or lowering the tray to the desired position.
Step No. 3 – Remove the retainer from a nail coil and
place the nail coil in the magazine with the tips of the nails
against the loading tray and with about 4 inches of coil
unwound.
Step No. 4 - Slide the free strip of nails along the top of
the feeder body assembly and place the first nail between
the feed claw and the locator.
Step No. 5 - Carefully close and latch the magazine door.
Step No. 6 - Advance the first nail into driving position by
cycling the tool once against a work surface. The nailer
is now ready for use.
7

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

T250a-f16 seriePowermaster plus rhp-350

Tabla de contenido