5
2
3
9
6
B60E
3.
Installation
•
Check consignment for completeness and for any signs of damage
incurred during transit
•
Use the lifting eyebolt (1) when lifting the unit (screw the bolt in all
the way). For safety reasons, the grinding machine and the base
should be transported separately
•
Take care not to damage the hoses (14, 15)
Installation:
•
Run the power cable to the rear of the machine
•
Run the transparent return hose (15) through the base and clamp
to the return pipe (10) with a hose clip
•
Run hoses (14, 15, 19, 20) through the cabinet top to the
containers (see connections below)
•
Remove the lifting eyebolt after transport has been completed
•
Open flap (6), release brake (5) (insert a hexagon screwdriver
SW6 in the tapped hole to push the pin back)
•
Lift the top (2) and remove the transport safety (Styrofoam)
•
Lower the top (2) approximately 50 mm, swing locating stop (4) to
the right and close the flap (6)
3.1
Hydraulic oil container
Connection:
4
•
Unscrew the nut (7) and remove the cap (1)
•
Attach the hose (4) and tighten the nut (7)
7
•
Open lid (2), remove end plate (3)
1
•
Insert hose (5) without filter (6) through lid (2)
•
Mount filter (6) on hose (5)
8
•
Add hydraulic oil as specified in "maintenance"
•
Replace the lid (2)
3.2
Grinding coolant container
Prepare the grinding coolant:
•
Mixture ratio: 1 : 30 (0.6 - 0.7 liters of Henkel P3-MULTAN 41-3 to
20 liters of water)
•
Clean container (13) and fill it with grinding coolant
•
Run intake hose (14) with filter (6) into the container
•
Insert the filter paper (16) between the filter screens (17)
•
Hang the filter screens into the container; the return flow/grinding
coolant must reach into the filter screens
quicksharp
9