12. PROCEDURE IN CASE OF FAULT WITH LOAD
SUSPENDED
- If possible remove the load from the nearest level, then
dismantle the hoist and service it.
- If this is not possible, use another lifting machine (with
adequate load bearing capacity) from higher up and suspend
the faulty hoist both at the load and at the hoist attachment
point.
Remove the split pin and lift the faulty hoist slowly off its fitting,
then lower the entire load to the ground.
- DO NOT adjust the motor brake with the load suspended as it
would be uncontrollable.
- DO NOT try to service the machine with the load suspended.
13. NOISE LEVEL AT THE OPERATOR S EAR
The level Lp(A) given in the TECHNICAL DATA chart
corresponds to the weighted equivalent sound pressure level
on scale A of European Directive 2006/42/EC. This level is
measured with no load, at the operator s head in the working
position 1.5 metres away from the instrument, considering the
different working conditions.