INSTALLATION REQUIREMENTS
IMPORTANT: This appliance shall be installed only by qualified technician and in accordance with the
manufacturer's installation instructions, local gas fitting regulations, municipal building codes, electrical wiring
regulations, local water supply regulations.
IMPORTANT: Save these instructions for local electrical inspectors use. Read and save these instructions for
future use.
TOOLS AND PARTS
Tools Required
CSA-Approved Flexible 1/2" or 3/4" Gas Line
Parts Required
Pencil
Ruler
Phillips Head Screwdriver
LOCATION REQUIREMENTS
The air necessary for the combustion of the gas must be able to flow into the room naturally. The air must flow
into the room directly through openings in the outside walls. These openings must have an unobstructed cross-section
not less than 2m³/h for each kw of power.
Pipe Fittings
Pipe Wrench
Safety Glasses
Shut-Off Valve
1/8" Drill Bit &
Electric or Hand Drill
7
Figure 2
Joint Sealant
Figure 3
Saber Saw