FRONT AND REAR RAILS
Hold the yellow cover on the end of an upper handrail using your thumb and
1.
fingers, and push it towards the end of the rail. Hold it in this position while you lift
the end to unfasten it from its anchor point, see Figure 1.5.
Rotate the anchor point through 90 degrees to face the opposite side frames, see
2.
Figure 1.6.
ROTATE
ROTATE
Rotate the rail end towards the opposite frame.
3.
Extend the rail until you hear two clicks. This tells you that the 3-part rail has been
4.
securely locked in its extended position. Carefully let the rail hang down from the
attached end.
Note. You should be able to see the ball-bearings from the locking mechanism
protruding from the side walls of the rail.
Repeat steps 1 to 4 for the other guardrails.
5.
Lift one of the extended rails above its new anchor point on the opposite frame
6.
and push down to lock in place.
Repeat for the other three rails to complete the erection of the Safety Cage,
7.
Figure 1.7.
The Safety Cage can remain 'built' until theTELETOWER® is collapsed.
8.
1.5
1.7
English
1.6
11