Orbis VIARIS CITY Manual De Uso página 60

Ocultar thumbs Ver también para VIARIS CITY:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Options
Depending on the model, VIARIS CITY smart charging stations can include the
following:
Stand for installation on the ground.
Surge protection and protection against insulation failures.
In accordance with Spain's ITC-BT-52 instruction on temporary and
transitory surges + circuit breaker switch (overload protection suitable
to smart charger current) + DC protection. Once the station has been
installed, check correct DC protection operation by clicking the
differential test button.
Single-phase and three-phase secondary meter
With certification according to the MID Directive (2004/22/EC) and EN
50470-3 standard
Activation without RFID card using a touch sensor.
For installations where user identification is not required.
Ethernet communication
For installations where Ethernet communication is required.
3G communications
For installations where communications are required and no Ethernet
access is available.
Maintenance
The equipment is designed to ensure low maintenance in line with the long life
of its parts, limited to cleaning tasks, operating checks and verification of input
voltage and differential protection values. We recommend inspecting the
equipment once a year.
The equipment must be disconnected from the supply voltage in order to clean
and check connections. Any handling that entails opening the equipment must
be done by qualified and duly authorised technical personnel.
16

Publicidad

Tabla de contenido
loading

Tabla de contenido