Test Procedures; Instructing The Operator - Hofmann geodyna 7400 Manual Del Operador

Tabla de contenido

Publicidad

M4x10 (4x)
1
126
iii-4
2
iii-5
Installation
Fitting and connecting the monitor
Fig. iii-4
Fitting the monitor
The 4 screws needed (M4x10) to fi x the VESA support
to the monitor are part of the kit supplied.
Fig.
iii-5
Connection of monitor and PC
Caution
Before connecting the electronic cables turn off the
mains switch.
— Insert the monitor connector into the right socket
(item 1) of the embedded unit.
— Insert the monitor main connector into the socket
(item 2).
iv Test procedures
• Balance a wheel to less than 0.25 oz. (3,5 grams)
• Balance a wheel to less than 5 grams (0.25 oz.) per
per plane.
plane.
• Perform a User Calibration.
v Instructing the operator
(Following applies only if a unit is installed by a service
Technician)
• Show and explain the Safety Booklet.
• Show the operator how to switch the unit on and
off.
• Show the operator how to perform an emergency
stop.
• Show the operator how to select a wheel type, enter
data and apply a weight.
F
6.2.

Publicidad

Tabla de contenido
loading

Tabla de contenido