Adjusting Air Pressure; Loading Nails - Hitachi Koki NV 75AG Instrucciones Y Manual De Seguridad

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

English
THE PUSH LEVER AND TRIGGER MUST MOVE
SMOOTHLY.
Push Lever
(2) Adjust the air pressure to 70 psi (4.9 bar 5 kgf/cm
Connect the air hose.
Do not load any nails in the Nailer.
THE NAILER MUST NOT LEAK AIR.
Hold the Nailer downward and pull the trigger.
THE NAILER MUST NOT OPERATE.
(3) With finger off the trigger, depress the push lever
against the workpiece.
THE NAILER MUST NOT OPERATE.
Trigger
Do not
connect
air hose
2
).
Pull Trigger
Do not pull Trigger
Depress Push Lever
(4) Without touching the trigger, depress the push lever
against the workpiece.
Pull the trigger.
THE NAILER MUST OPERATE.
(5) With the Nailer off the workpiece, pull the trigger.
Depress the push lever against the workpiece.
THE NAILER MUST OPERATE.
(6) If no abnormal operation is observed, you may load
nails in the Nailer.
Drive nails into the workpiece that is the same type to
be used in the actual application.
THE NAILER MUST OPERATE PROPERLY.

ADJUSTING AIR PRESSURE

Do not exceed 120 psi (8.3 bar 8.5 kgf/cm
Adjust the air pressure at recommended operating
pressure 70 – 120 psi (4.9 – 8.3 bar 5 – 8.5 kgf/cm
according to the length of nails and the hardness of
workpiece.
The correct air pressure is the lowest pressure which will
do the job. Using the Nailer at a higher than required air
pressure unnecessarily over stresses the Nailer.

LOADING NAILS

When loading nails into Nailer,
1) do not pull trigger;
2) do not depress push lever; and
3) keep Nailer pointed downward.
(1) Grip the nail guide and knob with finger.
Press the knob down and swing the nail guide open.
And open the magazine cover.
Nail guide
— 12 —
WARNING
2
).
2
)
WARNING
Knob

Publicidad

Tabla de contenido
loading

Tabla de contenido