Descargar Imprimir esta página

LEADING EDGE SAFETY Raptor R-2000 Manual De Instrucciones página 10

Sistema de protección

Publicidad

Idiomas disponibles

Idiomas disponibles

L
EADING
E
11.0 PROCEDURE FOR HANDLING THE Raptor R-2000
N
11.1 Before rescuing a fallen employee, assess the Raptor R-2000
G
tion. It is highly recommended that any rescuer be tied off in a FRS before attempting to aid in a rescue. The
L
number of rescuers allowed to tie off to the Raptor R-2000
of fallen workers. Up to two(2) additional rescuers may tie off to the Raptor R-2000
I
rings (for FRS).
S
11.2 If the Raptor R-2000
H
12.0 below), simply extend the cable to the fallen worker, verify that the worker has secured himself to the cable
carabineer, and crank the winch until the worker can climb onto the roof, can be pulled onto the roof by rescu-
ers, or can be lowered to the level below.
11.3 Complete the rescue procedure before attempting to "de-activate" the Raptor R-2000
R-2000
gage the Locking Mechanism by pulling the locking mechanism handle. Use a wooden or metal beam to apply
leverage to the Engagement Arm to disengage the claw and/or talon from the roof surface. Use caution when
disengaging the moving parts. Keep hands and feet free of all pinch points.
11.4 Do not reuse any Raptor R-2000
12.0 Importance of the Raptor Rescue Retrieval System
12.1 OSHA 1926.502(d) requires employers to provide prompt rescue of employees in the event of a fall or employ-
ers shall assure that employees are able to rescue themselves. To that end, most general contractors require
site-specific rescue plans. This is extremely time-consuming and leaves the possibility of oversight or unac-
counted-for site changes. The alternative is installing and using the Raptor Rescue Retrieval System
be used wherever the Raptor R-2000
simple means to retrieve the fallen worker, in every situation.
12.2 A well-thought-out rescue plan is USELESS if no one is aware of a fall. Jobsites are noisy, and workers are
focused on the task at hand. Therefore a co-worker is likely to fall without nearby rescuers taking any action.
The Raptor Alert
light.
12.3 If your Raptor R-2000
Leading Edge Safety, LLC at 1-888-990-2990 or your local dealer to order the Raptor Rescue Retrieval Sys-
tem
and Raptor Alert
a successful rescue.
13.0 Concrete Use Limitations
13.1 The Raptor R-2000
(2). Do NOT under any circumstances tie off more than one(1) workers in a PFAS configuration (i.e. to the fall
arrest attachment rings) to a Raptor R-2000
13.2 If using the Raptor R-2000
the Raptor R-2000
13.3 Make sure the concrete surface is not wet (i.e. precipitation, condensation, water run-off), is not oily or covered
in any substance, and is free of debris including loose dust.
13.4 If there is any question or uncertainty about a particular substrate or configuration, contact Leading Edge Safe-
ty, LLC at 1-888-990-2990.
13.5 To have a specific substrate/configuration tested for your specific application, contact Leading Edge Safety, LLC
at 1-888-990-2990.
E
/R
DGE
APTOR
unit comes with a Raptor Rescue Retrieval System
has been activated, the Engagement Arm will likely be severely wedged into the roof surface. Disen-
greatly increases the chance of a rescue by emitting a 130 decibel siren and amber strobe-
is not equipped with the Raptor Rescue Retrieval System
and tremendously increase the effectiveness of the Raptor R-2000
is rated for 4,000 and 6,000 psi concrete fall arrest of a maximum of one(1) and NOT two
Unit on any type of Concrete surface, install the Attachment Restrictor on one of
Attachment Rings, to prevent a second person from tying-off to the Unit.
M
R-2000™ I
FG
IN THE EVENT OF A FALL
PFAS attachment rings is two(2) minus the number
Unit until appropriate recertification and inspection has been performed.
and Raptor Alert
is used, and is completely intuitive and easy to use, giving rescuers a
fall arrest unit when using the Raptor R-2000
9
M
NSTRUCTION
Unit to be certain it has stabilized after activa-
to the fall restraint tie-off
(highly recommended, see Section
Unit. When the Raptor
or Raptor Alert
ANUAL
. It can
, contact
and likelihood of
on Concrete.

Publicidad

loading