M.-Nr. 10222060
Stand installation
Installing the stand on the floor
A
Mark the holes to be drilled for securing the stand. Use the template included in the machine's packing materials.
A
Drill 12mm dia. holes in the marked positions approx. 80mm deep.
A
Insert plugs (4) in the holes; see Fig. 1.
A
Fasten the stand to the floor with the wood screws (1) and 38x4 washers (2); see Fig. 1.
A
At the same time use the spacers (3) as necessary to compensate for unevenness in the floor; see Fig. 1.
Installing the machine on the stand
The arrow (2) embossed on the top of the stand points to the front; see Fig. 2.
A
Place the machine on the stand and align it using the machine feet.
A
Remove the machine front and rear panels.
A
Secure the machine to the stand using one bracket (1), two M6x25 screws (2), four B6.4 washers (3) and two M6
nuts (4) per corner; see Fig. 3.
A
Reinstall the machine front and rear panels.
A
For a closed stand, install the appropriate panels following the instructions included with them.
en-US
el
Οδηγίες τοποθέτησης βάσης UO4xx, UO8xx
Περιεχόμενα μέρη
Αριθμός Κωδικός
Ονομασία
προϊόντος
1
Βάση
16
Ροδέλα επικασσιτερωμένη B6,4
8
Βίδα εξάγωνη M6 x 25
8
Παξιμάδι εξάγωνο M6
4
Ούπατ S12
4
Εξάγωνη ξυλόβιδα 8 x 80
30
Βάση
4
Ροδέλα 38 x 4
4
Γωνία
Κίνδυνος λόγω ακατάλληλων εργασιών συντήρησης
ΠΡΟΕΙΔΟΠΟΙΗΣΗ
Κίνδυνος λόγω ακατάλληλων εργασιών συντήρησης
Οι ακατάλληλες εργασίες συντήρησης μπορεί να προκαλέσουν μεγάλες υλικές ζημιές ή σοβαρούς τραυματισμούς με
κίνδυνο της ίδιας της ζωής.
A
Οι εργασίες συντήρησης επιτρέπεται να γίνονται μόνο από ειδικευμένο τεχνικό με εξειδικευμένη εκπαίδευση,
εξειδικευμένες γνώσεις και εμπειρία.
A
Πρέπει να λαμβάνονται υπόψη οι ισχύουσες διατάξεις ασφαλείας.
A
Πρώτα διαβάστε την Τεχνική Τεκμηρίωση Service (TSD), και στη συνέχεια ενεργήστε.
Diese Unterlagen dürfen ohne unsere Genehmigung weder vervielfältigt noch Dritten zugänglich gemacht werden. Eigentumsrechte vorbehalten.
Umbau- und Montageanweisung
9 von 21
17.01.2018