OPERATION
1.7

Instructions of Use

1.- Vibrating Needle
2.- Reinforced Rubber Hose Tube
3.- Control Box
4.- Switch
-
Starting
The GOLD- type HIGH FREQUENCY ELECTRONIC VIBRATORS must be connected to single-
phasic networks of 200/240 V., or 110/120 V., and 50/60 Hz. according to country, with GROUND.
The 200/240 V., or 110/120 V., power supply should come from a transformer, (380/220 V. if the
main supply is 3x380 V. or 3x220 V.respectively). If this tension is produced with one phase and the
neutral, its failure could cause the destruction of the electronic equipment. Before starting you will
proceed to the total revision of the Vibrator, checking with special attention the state of the plug,
electric cable, control box, the switch and the operation of this. Against any laceration, it plows or
damage will be proceeded to repair, for avoiding later mishaps.
In NO case should repairs or changing of parts be done with the Vibrator plugged into the mains
supply.
The state of the connector should be checked periodically, measuring the continuity between the
vibrating needle and the pin of the plug.
Once everything is checked, make sure the switch is in the position "OFF", connect the plug and after
that switch to "ON". In NO case should the plug be connected to the mains with the needle
connected, that is with the switch in the position "ON", because when started in charged position the
electronic equipment may entry in emergency. In this case the switch should be put in the "OFF"
position the vibrator should be disconnected from the mains, wait 2 minuts, (the time it takes the
electronic equipment to erase the emergency and reconnect).
With temperatures below 3°C the vibrating needle may have difficulty starting after a long period of
disase. This is due to the solidification of the grease on the bearings, the vibrating needle should be
heated and kept working out of the mix unit it reaches its normal vibration level. (With a maximum
time of 2 minutes).
ATTENTION Check exhaustively the correct warning of the GROUND conductor.
1B-6
5.- Rubber Protection
6.- Electric Hose Cable
7.- Mains Plug Connection that contains
the security varistor surge
Fig.: 1
ENGLISH

Publicidad