C
HOOSING THE NATION
When first switched on, the inverter requires the language, system clock, address and nation of installation to be set, as well as
management of the MPPT for inverters with more than one MPPT tracker.
To choose a nation, select it from the list using the ↑ and ↓ keys. Confirm with the
The inverter only begins normal operation at the end of the settings.
Due to continuous product development, the inverter may also be available in nations not listed in "Table 2" in the Appendix. Go
to
www.aros-solar.com
for the updated list.
After 12 hours of feeding, the choices of nation and MPPT management are locked and disappear from the
settings menu. In order to correct any error after this period, you need to contact technical assistance.
If legislation requires the installation of a protective external interface (also known as ENS), the thresholds of the internal interface
protection can be expanded by means of the prot_ext software.
C
ONFIGURING THE
These inverters feature two separate DC inputs that can be used in a "parallel" or "independent" configuration. The selected
configuration is requested when the inverter is first started up, after choosing the nation, or can be set from the "SETTINGS"
menu, selecting "PV CONFIGURATION". This configuration can only be changed within the first twelve hours of feeding after
switching on for the first time.
DC I
(5-6-10-12.5
NPUTS
USE
button.
W
K
INVERTERS
- 45 -
)
In case the inverter is used with
two
PV
generators
different string length, orientation,
tilt, or modules model, it is
necessary
to
„independent‟.
having
choose