Terminator
10.
Fix expediter, RTD, and lead wire to
pipe.
13.
Install power cable.
-60°C ≤ Ta ≤ + 55°C
1725
II 2 GD Ex eb mb [ib]ib IIC T4, Ex tb IIIC T135°C
SIRA 12ATEX5239X
IECEx SIR 12.0103X Ex eb mb [ib]ib IIC T4, Ex tb IIIC T135°C
16.
Use screwdriver to ratchet on junction
box lid. Lid will rotate 30 degrees. Install
junction box lid and twist hand tight.
Insert screwdriver into ratchet slots
located on side of junction box base.
The Heat Tracing Specialists
ECM-P-XP
TM
11.
Mount junction box base on expediter.
Make sure to align slots to properly
orient junction box base. Tighten nut
with Terminator-LN-Tool. If mounting
horizontally, threaded gland holes must
face downward.
14.
Install electronic control module and
complete system wiring. Terminal set
screws shall be tightened to a torque
value of 1,4 Nm (12,4 lb-in). See page 5
for wiring details. Set modules electronic
control and/or control limiter at desired
setpoints.
PN 27673
IP66
17.
Lid latch mechanism fully engaged. To
remove lid, repeat step 16 but in the
opposite direction.
®
INSTALLATION PROCEDURES
12.
15.
4
Install M25 power gland (order
separately) and M25 blind plug.
Use the rotary switches for settling
Control and Limit Temperature,
Celsius or Fahrenheit and Auto or
Manual reset (Control switches on
Type "C", Limiter switches on Type
"L" and both on Type "CL").